해외표준 상세정보
관심표준 등록 : 표준업데이트 시 알림서비스
제공형태 더보기-

표준
판매
ISO 15926-13:2018
Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 13: Integrated asset planning life-cycle- 발행일 : 2018-08-02
- 발행기관 : ISO
상세정보
| 분야 | ISO/TC 184/SC 4 : Industrial data |
|---|---|
| 적용범위 | ISO 15926-13:2018 specifies an ontology for asset planning for process plants, including oil and gas production facilities. In addition, it specifies an XML schema, derived from the ontology, for exchange of data used for asset planning. The following are within the scope of ISO 15926-13:2018: · portfolio, programme and project plans and schedules; · operational modification and ongoing maintenance plans and schedules; · calendars for plan execution; · constraints on the temporal relationships between items within plans and schedules, including succession link, lag, free and total float; · activity breakdown structures; · locations of activities; · resources required, including material, equipment and human resources, and their costs; · interfaces to systems that process work orders and purchase orders; · responsible organizations and people; · progress tracking and resource usage; · reference to standard classes of facility, activity and resource. The following are outside the scope of ISO 15926-13:2018: · standard classes of facility, activity and resource; · production planning; · plan simulation and optimization; · hazard identification and risk analysis; · manning and training of personnel; · budgeting and cost allocation. |
| 국제분류(ICS)코드 |
25.040.40 : 산업 공정 측정 및 제어
75.020 : 석유 및 천연가스의 추출 및 처리 |
| 페이지수 | 96 |
| Edition | 1 |
이력정보
| No. | 표준번호 | 표준명 | 발행일 | 상태 |
|---|---|---|---|---|
| 1 | ISO 15926-13:2018상세보기 | Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 13: Integrated asset planning life-cycle | 2018-08-02 | 표준 |
관련상품
- ISO 15926-2:2003 - Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 2: Data model
- ISO 15926-1:2004 - Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 1: Overview and fundamental principles
- ISO/TS 15926-3:2009 - Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 3: Reference data for geometry and topology
- ISO/TS 15926-8:2011 - Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 8: Implementation methods for the integration of distributed systems: Web Ontology Language (OWL) implementation
- ISO/TS 15926-7:2011 - Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 7: Implementation methods for the integration of distributed systems: Template methodology
다른 사람이 함께 구입한 상품
- 함께 구입한 상품이 존재하지 않습니다.
추천 상품
- IEC TS 63134:2020 - Active assisted living (AAL) use cases
- IEC 60034-5:2020 RLV - Rotating electrical machines - Part 5: Degrees of protection provided by the integral design of rotating electrical machines (IP code) - Classification
- KS B ISO/TS 25740-1 - 에스컬레이터 및 무빙워크에 대한 안전요건 — 제1부: 세계공통 필수 안전요건(GESRs)
- KS B ISO/TS 8100-21 - 승객 및 화물 운송용 엘리베이터 —제21부: 세계공통 필수안전요건(GESRs)을 충족하는 세계공통 안전 파라미터(GSPs)
- KS C IEC TS 62872 - 산업 시설과 스마트 그리드 사이의 산업 공정 측정, 제어 및 자동화 시스템 인터페이스
제공형태 닫기
PDF :
직접 파일 다운로드 및 인쇄(마이페이지 확인)보안PDF :
직접 파일 다운로드 및 인쇄(마이페이지 확인)* 단, 파일이동 및 복사 불가, 1회 다운로드 및 인쇄가능PRINT :
인쇄본 우편발송, 2~3일 소요(PDF파일 미제공)BOOK :
인쇄본 우편발송, 2~3일 소요(PDF파일 미제공)ZIP :
압축파일형태로 제공 (PDF, HTML, TXT, XLS 등으로 구성), 직접 파일 다운로드(마이페이지 확인)CD/DVD :
직접 파일 다운로드 및 인쇄(마이페이지 확인)DB :
별도 정보 제공HARDCOPY :
해외 배송 상품, 최대 3주 소요바인더 :
바인더 우편발송, 2~3일 소요온라인구독 :
WEB 접속 후 실시간 열람, 출력(1년간)PDF+PRINT :
직접 파일 다운로드 및 인쇄본 우편발송(2~3일 소요)보안PDF+PRINT :
직접 파일 다운로드 및 인쇄본 우편발송(2~3일 소요)* 단, 파일이동 및 복사 불가, 1회 다운로드 및 인쇄가능ASME PBVC Plus :
인쇄본 우편발송 및 온라인 구독(1User용, 2년)