QUICK

TOP

해외표준 상세정보

관심표준 등록 : 표준업데이트 시 알림서비스

제공형태 더보기
  • KS

    초안

    판매

    ISO/DIS 19905-4

    Oil and gas industries including lower carbon energy — Site-specific assessment of mobile offshore units — Part 4: Jack-up installation and removal at a site
    • 발행일 :
    • 발행기관 : ISO
    즐겨찾기 장바구니 담기
    닫기

    상품이 장바구니에 담겼습니다.

    장바구니로 이동
    • [영어]PDF 223,800원

    • [영어]PRINT 223,800원

상세정보

분야 ISO/TC 67/SC 7 : Offshore structures
적용범위

This document specifies requirements and guidance for the installation on and removal from site of independent leg jack‑up units for use in the oil and gas industries including lower carbon energy. It addresses the assessment of:

a)       the installation operation from when the jack-up enters the defined safety zone of the host platform or the intended site to when it is elevated to the operating hull elevation above LAT and is ready for operations;

b)       the removal operation from when the jack-up is ready to jack-down to when it departs the defined safety zone.

NOTE 1:      Whilst this document is for independent leg jack-up units, many of the provisions can be applied to mat-supported jack-up units.

NOTE 2:      When the jack-up has propulsion assist or is self-propelled the provisions of this standard related to positioning should be replaced or supplemented as appropriate.

The assessment of a jack-up at a specific site is normally comprised of two parts.

1)      Assessing that the unit can survive in the elevated mode.

2)      Assessing that the unit can be safely installed at, and removed from, the site.

Item 1 is addressed in ISO 19905-1 and item 2 is addressed in ISO 19905-4.

Much of the information required for an ISO 19905-1 assessment (referred to herein as a site-specific assessment elevated – SSA-E) is also required for an ISO 19905-4 assessment (referred to herein as a site-specific installation and removal assessment – SSA-I). There is, however, additional information used in an SSA-I that is best gathered at the same time that data for the SSA-E is collected. This is further discussed in 5.1.

This document is for the installation of a jack-up on, and the removal of a jack-up from a site. Specifically excluded from the scope of this document is the move of the jack-up between sites and elevated operations, which are covered by other requirements. This document is structured to consider the issues associated with a particular site and is not necessarily organized in the same way that a jack-up owner or surveyor would develop a rig move procedure (which is normally developed in terms of leaving one site and being elevated at the next), see Figure 1-1. 

Figure 11 — Alignment of specific assessments with multiple sites and rig moves

The provisions of this document form an integrated approach for SSA-I, which is intended to be used in its entirety for the site-specific installation and removal assessment of an independent leg jack‑up.

In this document it is assumed that a site-specific assessment for elevated (survival) operations (SSA-E) is available for the specific site.

국제분류(ICS)코드 75.180.10 : 탐사 및 채취 장비
페이지수 146
Edition 1

이력정보

No. 표준번호 표준명 발행일 상태
1 ISO/DIS 19905-4상세보기 Oil and gas industries including lower carbon energy — Site-specific assessment of mobile offshore units — Part 4: Jack-up installation and removal at a site 초안

다른 사람이 함께 구입한 상품

  • 함께 구입한 상품이 존재하지 않습니다.

제공형태 닫기

  • PDF :

    직접 파일 다운로드 및 인쇄(마이페이지 확인)
  • 보안PDF :

    직접 파일 다운로드 및 인쇄(마이페이지 확인)* 단, 파일이동 및 복사 불가, 1회 다운로드 및 인쇄가능
  • PRINT :

    인쇄본 우편발송, 2~3일 소요(PDF파일 미제공)
  • BOOK :

    인쇄본 우편발송, 2~3일 소요(PDF파일 미제공)
  • ZIP :

    압축파일형태로 제공 (PDF, HTML, TXT, XLS 등으로 구성), 직접 파일 다운로드(마이페이지 확인)
  • CD/DVD :

    직접 파일 다운로드 및 인쇄(마이페이지 확인)
  • DB :

    별도 정보 제공
  • HARDCOPY :

    해외 배송 상품, 최대 3주 소요
  • 바인더 :

    바인더 우편발송, 2~3일 소요
  • 온라인구독 :

    WEB 접속 후 실시간 열람, 출력(1년간)