해외표준 상세정보
관심표준 등록 : 표준업데이트 시 알림서비스
제공형태 더보기-
표준
판매
N285.7-15 (R2020)
Periodic inspection of CANDU nuclear power plant balance of plant systems and components- 발행일 : 2015-01-01
- 발행기관 : CSA
상세정보
분야 | |
---|---|
적용범위 | Preface This is the first edition of CSA N285.7, Periodic inspection of CANDU nuclear power plant balance of plant systems and components. This Standard is one of a series of Standards intended to provide uniform requirements for CANDU nuclear power plants. Note: CANDU (CANada Deuterium Uranium) is a registered trademark of Atomic Energy of Canada Limited (AECL). This Standard provides requirements for the periodic inspection of balance of plant systems and components. The CSA N-Series of Standards provides an interlinked set of requirements for the management of nuclear facilities and activities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while the other CSA nuclear Standards provide technical requirements and guidance that support the management system. This Standard works in harmony with CSA N286 and does not duplicate the generic requirements of CSA N286; however, it may provide more specific direction for those requirements. Users of this Standard are reminded that the operation of nuclear facilities in Canada is subject to the requirements of the Nuclear Safety and Control Act and Regulations. The Canadian Nuclear Safety Commission may impose additional requirements to those specified in this Standard. Portions of this Standard have been developed using the Risk Informed In-service Inspection (RI-ISI) methodologies and definitions from ASME BPVC Section XI with 2011 Addenda, Code Case N-578-1, ASME RA-Sa-2009 and EPRI RI-ISI TR-112657 Rev B-A. Excerpts reprinted with permission from The American Society of Mechanical Engineers, Electric Power Research Institute, Inc., and International Atomic Energy Agency. Scope 1.1 This Standard defines requirements for the periodic inspection of balance of plant pressure retaining systems, components, and supports that form part of a CANDU nuclear power plant using a risk informed in-service inspection (RI-ISI) methodology. Periodic inspection (see Annex A for additional guidance) is considered to include the fluid boundary portions of balance of plant systems, components and piping, including their supports that comprise a complete nuclear power plant, excluding the following systems or portions thereof: a) Systems, and systems connected thereto, containing the fluid that, under normal conditions, directly transports heat from nuclear fuel, and other systems whose failure can result in a significant release of radioactive substances. Note: These systems or portions of systems are subject to inspection in accordance with Clause 3.3.1(a) in CSA N285.4. b) Systems essential for the safe shutdown of the reactor and/or the safe cooling of the nuclear fuel in the event of a process system failure. Note: These systems or portions of systems are subject to inspection in accordance with Clause 3.3.1(b) in CSA N285.4. Compressors, turbines, generators, engines, and hydraulic or pneumatic cylinders are exempt from the inspection requirements of this Standard. This includes piping internal to equipment or mounted upon equipment that carries fluid from one chamber to another on the same foundation. Note: To arrive at a periodic inspection program, the user should consider the inspections, examinations, and tests performed by other programs such as pipe wall thinning, vessel inspections, equipment reliability, and maintenance programs in addition to RI-ISI. Inspections performed as part of supporting programs are not expected to be repeated in this periodic inspection program, but should be credited to this periodic inspection program to provide assurance that the program satisfies the intended purpose as described in Annex A. 1.2 This Standard addresses the following requirements a) failure aspects; b) classification of areas subject to inspection; c) provision for access; d) inspection techniques and procedures; e) personnel qualifications; f) frequency of inspection; g) responsibilities; h) documentation; i) records; j) evaluation of inspection results; k) dispositioning; and l) repair, replacement and modification requirements. 1.3 The values given in SI units are the units of record for the purposes of this Standard. The values given in parentheses are for information and comparison only. 1.4 In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application. |
국제분류(ICS)코드 | |
페이지수 | 140 |
Edition |
이력정보
No. | 표준번호 | 표준명 | 발행일 | 상태 |
---|---|---|---|---|
1 | CSA N285.7:21상세보기 | Periodic inspection of CANDU nuclear power plant balance of plant systems and components | 2021-01-01 | 표준 |
2 | N285.7-15 (R2020)상세보기 | Periodic inspection of CANDU nuclear power plant balance of plant systems and components | 2015-01-01 | 표준 |
관련상품
- 관련상품이 존재하지 않습니다.
다른 사람이 함께 구입한 상품
- C22.3 NO. 4-1974 (R2020) - Control of Electrochemical Corrosion of Underground Metallic Structures
- C108.1.2-M1981 (R2013) - Electromagnetic Interference Measuring Instrument - ANSI Type Published by CSA Group in 1981, Reaffirmed in 2013, Withdrawn
- B52 PACKAGE - Consists of B52-05, Mechanical Refrigeration Code and B52HB-05, A Practical Handbook for Implementing B52-05
- T568.2-3-05 (R2010) - Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted Pair Cabling Components - Addendum 3 - Additional Considerations for Insertion Loss and Return Loss Pass/Fail Determination
- CAN/CSA-B45 SERIES-02 (R2013) - Plumbing Fixtures (Consists of B45.0, B45.1, B45.2, B45.3, B45.4, B45.5, B45.6, B45.7, B45.8 and B45.9) Published by CSA Group in 2002, Reaffirmed in 2013, Withdrawn
추천 상품
- IEC TS 63134:2020 - Active assisted living (AAL) use cases
- IEC 60034-5:2020 RLV - Rotating electrical machines - Part 5: Degrees of protection provided by the integral design of rotating electrical machines (IP code) - Classification
- KS B ISO TS 25740-1 - 에스컬레이터 및 무빙워크에 대한 안전요건 — 제1부: 세계공통 필수 안전요건(GESRs)
- KS B ISO TS 8100-21 - 승객 및 화물 운송용 엘리베이터 —제21부: 세계공통 필수안전요건(GESRs)을 충족하는 세계공통 안전 파라미터(GSPs)
- KS C IEC TS 62872 - 산업 시설과 스마트 그리드 사이의 산업 공정 측정, 제어 및 자동화 시스템 인터페이스
제공형태 닫기
PDF :
직접 파일 다운로드 및 인쇄(마이페이지 확인)보안PDF :
직접 파일 다운로드 및 인쇄(마이페이지 확인)* 단, 파일이동 및 복사 불가, 1회 다운로드 및 인쇄가능PRINT :
인쇄본 우편발송, 2~3일 소요(PDF파일 미제공)BOOK :
인쇄본 우편발송, 2~3일 소요(PDF파일 미제공)ZIP :
압축파일형태로 제공 (PDF, HTML, TXT, XLS 등으로 구성), 직접 파일 다운로드(마이페이지 확인)CD/DVD :
직접 파일 다운로드 및 인쇄(마이페이지 확인)DB :
별도 정보 제공HARDCOPY :
해외 배송 상품, 최대 3주 소요바인더 :
바인더 우편발송, 2~3일 소요온라인구독 :
WEB 접속 후 실시간 열람, 출력(1년간)